58 meter CRN, New Zealand

During the autumn of 2019 and early 2020 AAA Coatings carried out refinishing works on 58 meter CRN. This project was carried out in water with a full access scaffold and containment cover. The works included:

• A skim fair of the Hull

• Full primer application

• A change of colour on the hull, including a show coat

• Priming and topcoating of the mast and superstructure.

58 meter CRN before fairing and refinishing

58 meter CRN after fairing and refinishing