During the autumn of 2019 and early 2020 AAA Coatings carried out refinishing works on 58 meter CRN. This project was carried out in water with a full access scaffold and containment cover. The works included:
• A skim fair of the Hull
• Full primer application
• A change of colour on the hull, including a show coat
• Priming and topcoating of the mast and superstructure.