During the autumn of 2019 and early 2020 AAA Coatings carried out extensive refinishing works on the Hull and areas of the Superstructure of the 74-meter CRN, based in STP Palma de Mallorca. The project was carried out in the water with a full access scaffold and containment cover. There was also extensive structural changes made which required the complete Awl Grip fairing and paint system.
• Priming and top coating of the Superstructure after modification works